|
Lane
Closures and Brief Interruptions Are Scheduled On I-95 Southbound
Between
Exits 27 & 26 On Monday Night, June 2, 2003
For Installation Of Overhead Signs & Supports
Press
Release Date: May 30, 2003
Contact: Paula Sakofs (203) 388-4409
MetroPool, Inc.
Bridgeport,
Connecticut - Connecticut Department of Transportation officials
have announced that, weather permitting, the right and center lanes
will be closed on
I-95, southbound, between Exits 27 & 26, and there will be brief
interruptions in the left lane, between these same exits, on Monday
night, June 2, 2003.
The
work will commence at 7:00 PM when the right lane on I-95 southbound,
between Exits 27 & 26, is scheduled to be closed until 6:00
AM. This will be followed by the closure of the center lane at 11:00
PM, until 6:00 AM. After midnight, three brief interruptions are
scheduled in the left lane for a duration of approximately ten minutes
each (the left lane will be closed during these times). Traffic
will be permitted to clear between each brief interruption. All
lanes are scheduled to re-open by no later than 6:00 AM the following
morning.
During
the brief interruptions, the entrance ramp from Myrtle Avenue to
I-95 southbound and the exit ramp Route 8/25 southbound to I-95
southbound will also be closed.
These
lane closures and brief interruptions are necessary to allow for
the installation of overhead signs and supports. In the event of
inclement weather, this work will take place on Tuesday night, June
3, 2003.
Motorists
are advised to allow for extra travel time and to use caution when
traveling through this and all other construction zones.
For
more information please visit:
MetroPool: www.metropool.com
Bridgeport Project: www.bridgeportcorridor.com
You
can call MetroPool at (203) 388-4409 or toll free at (800) FIND-RIDE...that's
1-800-346-3743.
- end -
|