Information for this report is courtesy of
the Connecticut Department of Transportation

Visit
ConnDOT's Traffic Cameras Page
If you have
questions about construction,
please contact Paula Sakofs at [email protected].
Thursday,
June 3, 2004 (Night)
Darien:
I-95 southbound, Exits 12 to 11, right lane closed, 7:00pm
to 6:00am.
Darien/Norwalk:
I-95 northbound and southbound, Exits 13 to 16:
- northbound, various lanes closed, 8:00pm to 6:00am
- southbound, left and center lanes closed, 7:00pm to 6:00am
Bridgeport:
I-95 northbound, Exits 26 to 27, right and center lanes closed, 7:00pm
to 6:00am, expansion joints.
Bridgeport:
I-95 northbound, Exits 27 to 30, right and center lanes
closed, 9:00pm to 5:30am, replace joints.
Bridgeport:
I-95 southbound, Exits 26 to 23, left and center lanes closed, 7:00pm
to 6:00am.
West Haven:
I-95 southbound, Exits 43 to 41, left lane closed, 7:00pm
to 6:00am, line striping.
New Haven:
I-95 northbound, Exits 46 to 50, right and center lanes
closed, 8:30pm to 5:00am, concrete header repairs (Pearl Harbor Memorial Bridge).
East Haven/New
Haven: I-95 southbound, Exits 51 to 47, left lane closed,
9:00pm to 5:00am, joints (Pearl Harbor Memorial Bridge).
North Haven/New
Haven: Route 91 southbound, Exits 9 to 8, various lanes closed, 7:00pm
to 5:00am, paving.
Waterbury:
I-84 eastbound, Exits 17 to 20, alternating lanes closed, 8:00pm to
6:00am, milling.
Waterbury:
I-84 westbound, Exits 23 to 20, alternating lanes closed, 7:00pm to
6:00am, paving.
Friday,
June 4, 2004 (Day)
North Haven:
Route 40 southbound, Exit 1 and Bailey Road, right lane closed, 9:00am
to 3:00pm, tar kettle.
Newtown:
Route 6 westbound, Church Hill Rd. near Conner Rd., various lanes closed,
8:00am to 4:00pm, permit job (pavement remediation).
Danbury:
Route 6 westbound, Newtown Rd. 200 ft. east of Pocono Rd., various
lanes closed, 9:00am to 4:00pm, permit job (monitoring well maintenance).
Danbury:
Route 6 eastbound, Mill Plain Rd. vicinity of Driftway Rd., various
lanes closed, 9:00am to 4:00pm, permit job (sanitary sewer installation).
Brookfield:
Route 202 southbound, Federal Rd. north of New Milford Rd., various
lanes closed, 9:00am to 4:00pm, permit job (road widening).
Waterbury:
Route 8 southbound, Exits 36 to 31, left lane closed, 9:00am to 3:00pm,
concrete repairs.
Waterbury:
I-84 westbound, Exits 23 to 19, alternating lanes closed, 8:00am to
3:30pm, line painting.
ONGOING
PROJECTS & SITUATIONAL NOTES
- CONNECTICUT -
Greenwich/Stamford:
Roadway resurfacing project on Route 15 (Merritt Parkway),
northbound between Exits 28 to 33.
Work is scheduled to begin Monday night, June 7th at 8:00pm through
Thursday, June 10th at 3:00pm. Following is the schedule
of lane closures and openings:
Monday night, June 7 to Tuesday, June 8 - one lane of traffic
northbound, between Exits 28 to 33, closed from 8:00pm to 3:00pm Tuesday. Both
lanes open on Tuesday from 3:00pm to 8:00pm.
Tuesday night, June 8 to Wednesday, June 9 - one lane of traffic
closed from 8:00pm to 3:00pm on Wednesday. Both lanes open on Wednesday from
3:00pm to 8:00pm.
Wednesday night, June 9 to Thursday, June 10 - one lane of
traffic closed from 8:00pm to 3:00pm on Thursday. Both lanes open on Thursday
at 3:00pm.
Bridgeport:
Local road closures, in association with the I-95 Bridgeport Corridor
Reconstruction Project June 1st to 4th:
- Broad St. and Main St., between North & South Frontage Rds., alternating
closures, 7:00am to 4:00pm (7:00pm to 4:00am, Broad St. closed)
Bridgeport: I-95 northbound, Exits 23 to 30, bridge
maintenance project involves various lane closures through
June 10th. Work takes place, Monday through Thursday evenings, 9:00pm
to 5:00am each night, weather permitting.
Bridgeport:
I-95 Bridgeport Corridor Reconstruction Project -
the following closures will remain in place indefinitely, while
the highway is being repaired:
- Northbound Exit 25 on-ramp
- Southbound Exit 26 on-ramp
- Howard Avenue, between Cherry and Pine Streets
**The 45-mph posted speed limit through the Bridgeport construction area, from
Exits 24 to 30, will be strictly enforced.
Greenwich:
Road work on Arch Street, between Railroad Ave. and Horseneck
Lane, is scheduled through end of July, for utility installations,
in association with the Arch Street Construction Project. Digging in various
portions of the roadway Monday through Friday nights, 8:00pm to 6:00am each
day. Anticipate alternating one-way traffic patterns; traffic control personnel
will be in place to assist during this time.
Watertown:
Route 8 northbound, between Exit 37 off-ramp and on-ramp, is restricted
to one lane for bridge rehabilitation. Work will take place, weather permitting,
and is expected to be completed September 2004. Special note:
oversize and overweight vehicles will be required to detour off Rt. 8 NB at
Exit 37, Rt. 262. Follow Frost Bridge Rd. to access Rt. 8 NB entrance ramp.
New
Milford: portion of Route 7, between Dodd Rd. and Picket
District Rd., will be temporarily realigned. Traffic is being laterally shifted
to the west, which will allow permanent northbound Route 7 reconstruction. Two
11 ft. lanes and all residential/commercial driveways will be maintained during
construction.
Stamford:
The existing Stamford Transportation Center Parking Garage
reopened on March 1st. Parking spaces are available. For information about obtaining
a monthly parking permit contact Propark at 203-327-7998.
Download
a map of the parking garage (214 KB PDF).
You will need Adobe Acrobat Reader to view and print this PDF document, download
a free copy of the latest version of Acrobat Reader at http://www.adobe.com/products/acrobat/readstep2.html.
Greenwich:
Greenwich Railroad Station -
Track 3: construction through August 2004. Access to trains
via eight bridge plates located on the west end of the platform footbridge.
The stairs coming up from Steamboat Rd. are closed until further notice.
Track 4: construction through July 2004. The platform is closed
from the Pedestrian Bridge Overpass eastward. A temporary platform is open.
Branford/Guilford/Clinton:
Work on several Shore Line East Stations began at
the end of May, 2004. No service interruptions are anticipated at any of the
stations. For more information visit the I-95 New Haven Harbor Crossing Corridor
Improvement Project web
site and click on "What's New" (press release dated 5/13/04).
- NEW
YORK -
Information
across Westchester, Rockland, Orange, Dutchess, and Putnam: www.hudsonvalleytraveler.com
Elmsford:
For the week of May 31st, the fourth lane has opened
on I-87 NB, between the Broadway Bridge and the Tappan Zee approach. Visit the
web site for details: I-287
Interchange 8 project update
TRANSPORTATION
ALTERNATIVES
For
information about train service:
- call Metro-North at 1-800-METRO-INFO
- visit Metro-North's web
site
- Sign up to receive free email notifications from Metro-North:
http://as0.mta.info/mnr/email/home.cfm
For
information about carpooling or vanpooling:
- call MetroPool at 1-800-FIND-RIDE
- find out about ridematching
online
Please Note:
Road projects are weather sensitive; lane closures and other traffic restrictions
may be changed or cancelled, without notice in the event of inclement weather.
Unless otherwise noted, at least one lane in each direction will be open at
all times for maintenance and construction work on major highways. This report
includes the most current information from the Connecticut Department of Transportation
at the time it was prepared. However, it should be considered advisory in nature.
Highway conditions listed may be postponed, cancelled or otherwise changed without
notice; lane closures and other highway conditions that could affect traffic
may occur without being listed in this report. Use of public streets and highways
in Connecticut is at the risk of the owner and/or operator of the vehicle. Neither
the Connecticut Department of Transportation nor MetroPool may be held responsible
in any way for any travel decisions based in whole or in part on information
contained in this report, or for any consequences of such decisions.
|